S-303 - G4 Overhead crane Module 2.7 - 3.7

Course length:

24 Hours

Prerequisites:

The candidate must document to have previously completed Module 1.1 and Module 2.3Alternatively, modules 1.1 and 2.3 can be carried out in context of this module

Target audience:

Personnel who in their daily work will use crane/uses cranes

Course goals:

The objectice is to provide training so that the person acquires basic theoretical knowledge about the safe use of cranes, so that accidents are avoided

Course content:

Introduction and requirements for crane operator
Area for use of bridge-/overhead cranes
Accidents with bridge-/overhead cranes
Construction of bridge-/overhead cranes
Electrical and hydraulic system
Safety switches (overload)
Wire/block
Certification/documentation
Maintenance and inspection
Practical use of lifting equipment
Work tasks
Driving techniques
Exam

Max students per course:

12 (practical exercise 1 instructor pr 6 candidates)

Minimum students per course

4

Minimum attendance to be allowed a final exam:

90%

Examination

Theory min. 30 questionsA practical test will be thorough after the candidate in accordance with buddy program is able to document min. 40 hours practice

Course diploma/certificate:

A certificate of course completion shall be issued to each students who has successfully met the requirement of the course, The certificate shall include; PNI Training Centre AS, Course title, Date of the course, Date of birth (Student), Name of the student and signature by Managing Director

Validity:

In accordance with the company internal control system

Qualifications:

The instructor must be able to document knowledge in the subject and possess educational qualifications.

Upcoming course dates

Title Start Duration & reg.
G4 Overhead crane Module 2.7 - 3.7 20.02.2019 3 days
G4 Overhead crane Module 2.7 - 3.7 13.03.2019 3 days
G4 Overhead crane Module 2.7 - 3.7(English) 03.04.2019 3 days
G4 Overhead crane Module 2.7 - 3.7 08.05.2019 3 days
G4 Overhead crane Module 2.7 - 3.7 22.05.2019 3 days
G4 Overhead crane Module 2.7 - 3.7 05.06.2019 3 days
G4 Overhead crane Module 2.7 - 3.7 26.06.2019 3 days